Skip navigation links
Home
Family & Students
Schools
Board
Careers
Superintendent
Skip navigation links
Purchasing Department
Staff Directory
Bidder Application Form (PDF)
Annual Contracts
Frequently Used Terms
Vendor Required Forms
Solicitations
Active Bids & RFPs
All Bids & RFPs
All Bids
All RFPs
Construction
The Purchasing Process
The Competitive Process
SCCPSS Fiscal Funding States
Competitive Solicitation Methods
General Terms and Conditions
Minority/Women Owned Business Policy
GA State Laws
Supplier Code of Ethics
Tips for Doing Business with SCCPSS
Surplus Property
Modify settings and columns
M. Ann Levett, Ed.D.
Superintendent of Schools

Savannah-Chatham Co.
Public School System

208 Bull Street
Savannah, GA 31401
(912) 395-5600


Driving Directions:

208 Bull Street
(Admin. Offices)

2 Laura Avenue
(Board Meetings)

© 1998-present
All Rights Reserved
Bids & RFPs
  
View: 
Types
(ESPLOST) GC Savannah HS Culinary Arts LabUse SHIFT+ENTER to open the menu (new window).
8/22/2017 11:00 AMAwardedSupporting DocsBid C18-07 (ESPLOST)Bid; Construction
(ESPLOST) General Contracting Services for New Hampstead K-8 SchoolUse SHIFT+ENTER to open the menu (new window).
7/18/2019 11:00 AMAwardedSupporting DocsBid C20-01Bid; Construction
(ESPLOST) Georgetown K-8 HVAC and Fire Alarm Replacement ProjectUse SHIFT+ENTER to open the menu (new window).
10/8/2019 11:00 AMCancelledSupporting DocsBid C20-04Bid; Construction
(ESPLOST) Islands High School Campus Track and Multi-Purpose Field (Phase III)Use SHIFT+ENTER to open the menu (new window).
2/21/2019 11:00 AMAwardedSupporting DocsBid C19-19Bid; Construction
(ESPLOST) Islands Stadium Video ScoreboardUse SHIFT+ENTER to open the menu (new window).
7/18/2019 11:00 AMAwardedSupporting DocsRFP C20-05Bid; Construction
(ESPLOST) Juliette Low Elementary School Special Needs CanopyUse SHIFT+ENTER to open the menu (new window).
12/5/2019 11:00 AMOpenSupporting DocsBid C20-13Bid; Construction
(ESPLOST) Mercer Media Re-Roof and Gym Repair ProjectUse SHIFT+ENTER to open the menu (new window).
9/12/2019 11:00 AMUnder EvaluationSupporting DocsBid C20-09Bid; Construction
(ESPLOST) Security Vestibule Upgrades for IHS, SWMS and WCMSUse SHIFT+ENTER to open the menu (new window).
6/11/2019 11:00 AMAwardedSupporting DocsBid C19-27Bid; Construction
(ESPLOST) Southwest Elementary School Chilled Water Piping ReplacementUse SHIFT+ENTER to open the menu (new window).
4/24/2018 11:00 AMAwardedSupporting DocsBid C18-29 (ESPLOST)Bid; Construction
(ESPLOST) Windsor Forest High School Phase II ADA UpgradeUse SHIFT+ENTER to open the menu (new window).
11/7/2019 2:00 PMPending Board ApprovalSupporting DocsBid C20-10Bid; Construction
(ESPLOST) Woodville-Tompkins Gym Construction and Auditorium RenovationUse SHIFT+ENTER to open the menu (new window).
11/14/2019 11:00 AMUnder EvaluationSupporting DocsBid C20-12Bid; Construction
208 Bull Street Payroll Office HVAC UpgradesUse SHIFT+ENTER to open the menu (new window).
2/18/2016 2:00 PMAwardedSupporting DocsBid C16-28 (ESPLOST)Bid; Construction
208 Bull Street Restroom ConversionUse SHIFT+ENTER to open the menu (new window).
12/13/2016 11:00 AMAwardedSupporting DocsC17-12Bid; Construction
ADA Restroom Renovation at Oatland Wildlife CenterUse SHIFT+ENTER to open the menu (new window).
1/12/2017 11:00 AMAwardedSupporting DocsBid C17-13 Bid; Construction
Bid C18-03 (ESPLOST) Replacement of Cooling Tower at Coastal MiddleUse SHIFT+ENTER to open the menu (new window).
7/27/2017 11:00 AMAwardedSupporting DocsBid C18-03 (ESPLOST)Bid; Construction
Bid C16-26 Oatland Island Wildlife Center-Marine Contractor Services for Marsh Walkway RepairUse SHIFT+ENTER to open the menu (new window).
1/12/2016 2:00 PMAwardedSupporting DocsBid C16-26Bid; Construction
Boardroom Security (Phase 1) at Whitney Admin Complex SolicitationUse SHIFT+ENTER to open the menu (new window).
1/4/2018 11:00 AMCancelledSupporting DocsBid C18-17Bid; Construction
Boiler Replacement at District Central OfficesUse SHIFT+ENTER to open the menu (new window).
3/29/2016 2:00 PMAwardedSupporting DocsBid C16-42Bid; Construction
Bus Canopy Repair at Southwest Middle SchoolUse SHIFT+ENTER to open the menu (new window).
12/19/2017 11:00 AMAwardedSupporting DocsC18-11Bid; Construction
Bus Canopy Repair at Spencer Transitional SiteUse SHIFT+ENTER to open the menu (new window).
12/19/2017 2:00 PMAwardedSupporting DocsC18-12Bid; Construction
C16-37 Johnson High School Weight Room Door OpeningUse SHIFT+ENTER to open the menu (new window).
3/22/2016 11:00 AMCancelledSupporting DocsBid C16-37Bid; Construction
C16-38 Beach High School Alumni Recognition WallUse SHIFT+ENTER to open the menu (new window).
3/10/2016 11:00 AMAwardedSupporting DocsBid C16-38Bid; Construction
Canopy Repairs at Three SitesUse SHIFT+ENTER to open the menu (new window).
7/11/2017 11:00 AMCancelledSupporting DocsBid C18-01Bid; Construction
Canopy Roof Repairs at Bloomingdale and Pooler Elementary SchoolsUse SHIFT+ENTER to open the menu (new window).
7/31/2018 11:00 AMAwardedSupporting DocsBid C19-03Bid; Construction
Central Office Emergency LightingUse SHIFT+ENTER to open the menu (new window).
7/25/2019 11:00 AMAwardedSupporting DocsBid C20-06Bid; Construction
Chiller Replacement at Savannah High SchoolUse SHIFT+ENTER to open the menu (new window).
11/1/2016 11:00 AMAwardedSupporting DocsBid C17-06Bid; Construction
Civil, Surveying and Environmental Services (Annual Contract)Use SHIFT+ENTER to open the menu (new window).
1/26/2016 3:00 PMAwardedSupporting DocsRFQ C16-23 (ESPLOST)Construction; RFQ
Coastal Georgia Comprehensive Academy GNETS Grant Project-General ImprovementsUse SHIFT+ENTER to open the menu (new window).
3/21/2019 11:00 AMAwardedSupporting DocsBid C19-20Bid; Construction
Coastal Middle School Reroofing ReplacementUse SHIFT+ENTER to open the menu (new window).
7/21/2015 11:00 AMAwardedSupporting DocsBid C16-04Bid; Construction
Construction Management Agent (Annual Contract)Use SHIFT+ENTER to open the menu (new window).
6/21/2018 11:00 AMAwardedSupporting DocsRFP C18-32 (ESPLOST)Construction; RFP
Construction Manager at Risk Juliette Low Elementary SchoolUse SHIFT+ENTER to open the menu (new window).
10/15/2015 11:00 AMAwardedSupporting DocsRFQ C16-17Construction; RFQ
Construction Manager at Risk Juliette Low ElementaryUse SHIFT+ENTER to open the menu (new window).
4/16/2015 2:00 PMCancelledSupporting DocsRFQ C15-26 (ESPLOST)Construction; RFQ
Construction of Baseball Fields at Beach High SchoolUse SHIFT+ENTER to open the menu (new window).
1/26/2016 11:00 AMAwardedSupporting DocsBid C16-18 (ESPLOST)Bid; Construction
Construction of Beach High School Field HouseUse SHIFT+ENTER to open the menu (new window).
3/30/2017 11:00 AMAwardedSupporting DocsBid C17-19 (ESPLOST) Bid; Construction
Construction Program Management ServicesUse SHIFT+ENTER to open the menu (new window).
12/1/2016 11:00 AMAwardedSupporting DocsRFQ C17-10 (ESPLOST)Construction; RFQ
Cooling Tower Replacement at Johnson High SchoolUse SHIFT+ENTER to open the menu (new window).
4/12/2016 2:00 PMAwardedSupporting DocsC16-41Bid; Construction
Cooling Tower Replacement at Southwest Middle SchoolUse SHIFT+ENTER to open the menu (new window).
10/12/2017 11:00 AMAwardedSupporting DocsBid C18-09Bid; Construction
Cooling Tower Replacement at West Chatham Middle SchoolUse SHIFT+ENTER to open the menu (new window).
4/14/2016 11:00 AMAwardedSupporting DocsC16-40Bid; Construction
Countertop Upgrade at Savannah High SchoolUse SHIFT+ENTER to open the menu (new window).
10/18/2016 11:00 AMAwardedSupporting DocsC17-09Bid; Construction
CTAE Cosmetology Labs (Nails-Barbering) SolicitationUse SHIFT+ENTER to open the menu (new window).
10/25/2016 11:00 AMAwardedSupporting DocsBid C17-05 (ESPLOST) Bid; Construction
DeRenne Middle School Air Cooled Chiller ReplacementUse SHIFT+ENTER to open the menu (new window).
2/9/2016 11:00 AMAwardedSupporting DocsBid C16-32Bid; Construction
DeRenne Middle School Fire Alarm Replacement ProjectUse SHIFT+ENTER to open the menu (new window).
11/7/2019 11:00 AMUnder EvaluationSupporting DocsBid C20-11Bid; Construction
DeRenne Middle School Sign Monument Project C16-30Use SHIFT+ENTER to open the menu (new window).
1/26/2016 11:00 AMAwardedSupporting DocsBid C16-30Bid; Construction
Design Professional Services for ADA and Front Office Renovations at Windsor Forest, Groves, Jenkins and ShumanUse SHIFT+ENTER to open the menu (new window).
10/15/2015 2:00 PMAwardedSupporting DocsRFQ C16-13 (ESPLOST)Construction; RFQ
Design Professional Services for Garden City Elementary Re-roofing ProjectUse SHIFT+ENTER to open the menu (new window).
4/7/2016 11:00 AMAwardedSupporting DocsRFQ C16-43 (ESPLOST)Construction; RFQ
Design Professional Services for Haven Elementary School, Juliette Low Elementary School, and Spencer Elementary SchoolUse SHIFT+ENTER to open the menu (new window).
12/12/2014 2:00 PMAwardedSupporting DocsRFQ C15-17 ESPLOSTConstruction
Design Professional Services for HVAC System Replacement at Windsor Forest High SchoolUse SHIFT+ENTER to open the menu (new window).
3/26/2015 11:00 AMAwardedSupporting DocsRFQ C15-23 ESPLOSTConstruction; RFQ
Design Professional Services for Interior and Exterior Upgrades at Charles Ellis Montessori K-8 AcademUse SHIFT+ENTER to open the menu (new window).
10/15/2015 11:00 AMAwardedSupporting DocsRFQ C16-12 (ESPLOST)Construction; RFQ
Design Professional Services for Window Replacement at Savannah Arts AcademyUse SHIFT+ENTER to open the menu (new window).
7/23/2015 11:00 AMAwardedSupporting DocsRFQ C16-03 (ESPLOST)Construction; RFQ
Design Professional Services for Woodville Tompkins High School Gym Addition and Renovations ProjectUse SHIFT+ENTER to open the menu (new window).
5/31/2018 11:00 AMAwardedSupporting DocsRFQ C18-30 (ESPLOST)Construction; RFP; RFQ
East Broad Elementary Kitchen Grease Trap Replacement ProjectUse SHIFT+ENTER to open the menu (new window).
7/25/2019 2:00 PMAwardedSupporting DocsBid C20-07Bid; Construction
Emergency Transfer Switch and Generator Installation for Four (4) SitesUse SHIFT+ENTER to open the menu (new window).
4/26/2018 11:00 AMAwardedSupporting DocsBid C18-27Bid; Construction
Furniture Fixtures and Equipment - District Wide (Annual Contract) C16-34Use SHIFT+ENTER to open the menu (new window).
2/18/2016 11:00 AMAwardedSuporting DocsBid C16-34Bid; Construction
Furniture for Gadsden Elementary School (ESPLOST)Use SHIFT+ENTER to open the menu (new window).
12/8/2015 11:00 AMAwardedSupporting DocsBid C16-22 (ESPLOST)Bid; Construction
Furniture, Fixtures and Equipment (FFE) - District Wide (Annual Contract)Use SHIFT+ENTER to open the menu (new window).
9/27/2018 11:00 AMAwardedSupporting DocsBid C19-05Bid; Construction
Furniture, Fixtures and Equipment 2019 - District Wide (Annual Contract)Use SHIFT+ENTER to open the menu (new window).
7/25/2019 11:00 AMAwardedSupporting DocsBid C20-03 (ESPLOST/General Funds)Bid; Construction
Gadsden Elementary School GreenhouseUse SHIFT+ENTER to open the menu (new window).
4/18/2019 2:00 PMCancelledSupporting DocsBid C19-18Bid; Construction
Gadsden Elementary School Photovoltaic System ProjectUse SHIFT+ENTER to open the menu (new window).
8/2/2018 11:00 AMAwardedSupporting DocsBid C19-02Bid; Construction
Garden City Elementary HVAC ReplacementUse SHIFT+ENTER to open the menu (new window).
5/18/2017 11:00 AMAwardedSupporting DocsBid C17-24Bid; Construction
Garden City Elementary School Exterior PaintingUse SHIFT+ENTER to open the menu (new window).
6/13/2019 2:00 PMAwardedSupporting DocsBid C19-17Bid; Construction
Garden City Elementary School Re-Roofing ProjectUse SHIFT+ENTER to open the menu (new window).
6/20/2017 2:00 PMAwardedSupporting DocsBid C17-21 (ESPLOST) Bid; Construction
GC- Islands High School Auditorium Renovation ProjectUse SHIFT+ENTER to open the menu (new window).
10/27/2015 2:00 PMAwardedSupporting DocsBID C16-20 (ESPLOST)Bid; Construction
GC- Woodville-Tompkins Annex Reroofing ProjectUse SHIFT+ENTER to open the menu (new window).
10/27/2015 11:00 AMAwardedSupporting DocsBid C16-14 (ESPLOST)Bid; Construction
General Contracting Services for Addition and Renovations at John W. Hubert Middle SchoolUse SHIFT+ENTER to open the menu (new window).
7/16/2015 11:00 AMAwardedSupporting DocsBid C16-06 (ESPLOST)Bid; Construction
General Contracting Services for Beach High School Auditorium AdditionUse SHIFT+ENTER to open the menu (new window).
7/9/2019 11:00 AMAwardedSupporting DocsBid C20-02 (ESPLOST)Bid; Construction
General Contracting Services for Gym Floor for Woodville Tompkins High SchoolUse SHIFT+ENTER to open the menu (new window).
8/4/2015 11:00 AMAwardedSupporting DocsBid C16-05Construction
General Contracting Services for Pooler Elementary School Reroofing ProjectUse SHIFT+ENTER to open the menu (new window).
3/19/2015 2:00 PMAwardedsupporting docsBID C15-19 ESPLOSTConstruction
General Contracting Services for Renovation of Windsor Forest High School CafeteriaUse SHIFT+ENTER to open the menu (new window).
10/20/2016 11:00 AMAwardedSupporting DocsBid C17-04 (ESPLOST)Bid; Construction
General Contracting Services for the Construction of an Addition at the Woodville-Tompkins Technology and Career InstituteUse SHIFT+ENTER to open the menu (new window).
3/31/2016 2:00 PMAwardedSupporting DocsBID C16-39 (ESPLOST)Bid; Construction
General Contracting Services for the Garrison K-8 School Auditorium AdditionUse SHIFT+ENTER to open the menu (new window).
4/14/2016 2:00 PMAwardedSupporting DocsBid C16-27 (ESPLOST) Bid; Construction
Geotechnical, Special Inspections and Material Tesitng Services (Annual Contract)Use SHIFT+ENTER to open the menu (new window).
1/19/2016 11:00 AMAwardedSupporting DocsRFQ C16-21 (ESPLOST)Construction; RFQ
Godley Station Canopy InstallationUse SHIFT+ENTER to open the menu (new window).
1/18/2018 11:00 AMAwardedSupporting DocsBid C18-16Bid; Construction
Godley Station School HVAC ReplacementUse SHIFT+ENTER to open the menu (new window).
6/1/2017 11:00 AMAwardedSupporting DocsBid C17-26Bid; Construction
Groves High School Campus Master Planning Project Solicitation DocumentUse SHIFT+ENTER to open the menu (new window).
3/8/2018 11:00 AMAwardedSupporting DocsRFQ/RFP C18-24 (ESPLOST)Construction; RFP; RFQ
Hubert Middle School HVAC Roof Top Unit ReplacementUse SHIFT+ENTER to open the menu (new window).
1/22/2019 11:00 AMAwardedSupporting DocsBid C19-13 (ESPLOST)Bid; Construction
HVAC Platform Removal and Installation at District's Central OfficeUse SHIFT+ENTER to open the menu (new window).
4/19/2016 11:00 AMAwardedSupporting DocsC16-31Bid; Construction
Intercom Replacement for DeRenne Middle SchoolUse SHIFT+ENTER to open the menu (new window).
1/10/2017 11:00 AMAwardedSupporting DocsBid C17-14 Bid; Construction
Intercom System Replacement at Jenkins High SchoolUse SHIFT+ENTER to open the menu (new window).
3/26/2015 11:00 AMAwardedSupporting DocsBID C15-22Construction
Islands Campus Site Improvements Phase 2BUse SHIFT+ENTER to open the menu (new window).
12/6/2016 11:00 AMAwardedSupporting DocsBid C17-02 (ESPLOST)Bid; Construction
Islands High School Greenhouse AdditionUse SHIFT+ENTER to open the menu (new window).
3/21/2017 11:00 AMAwardedSupporting DocsBid C17-20Bid; Construction
Jacob G Smith Elementary School Kitchen UpgradeUse SHIFT+ENTER to open the menu (new window).
10/9/2018 11:00 AMAwardedSupporting DocsBid C19-08Bid; Construction
Jacob G. Smith Elementary School Kitchen UpgradeUse SHIFT+ENTER to open the menu (new window).
8/22/2018 12:00 AMCancelledSupporting DocsBid C19-07Bid; Construction
Jenkins High School Auditorium Chiller ReplacementUse SHIFT+ENTER to open the menu (new window).
3/15/2016 11:00 AMAwardedSupporting DocsBid C16-36Bid; Construction
Jenkins High School Replacement - Phase I SiteworkUse SHIFT+ENTER to open the menu (new window).
6/4/2019 11:00 AMAwardedSupporting DocsBid C19-25 (ESPLOST)Bid; Construction
Jenkins High School Replacement Phase 1 - Building Demolition SolicitationUse SHIFT+ENTER to open the menu (new window).
6/4/2019 11:00 AMAwardedSupporting DocsBid C19-26 (ESPLOST)Bid; Construction
Johnson High School HVAC ReplacementUse SHIFT+ENTER to open the menu (new window).
4/12/2018 11:00 AMAwardedSupporting DocsBid C18-18 (ESPLOST)Bid; Construction
Johnson HS Overhead Coiling Grilles ProjectUse SHIFT+ENTER to open the menu (new window).
5/19/2016 11:00 AMAwardedSupporting DocsBid C16-44Bid; Construction
Marine Contractor Services for Marsh Walkway Repairs at Oatland Island Wildlife CenterUse SHIFT+ENTER to open the menu (new window).
9/24/2015 11:00 AMCancelledSupporting DocsBid C16-16Bid; Construction
Marshpoint Elementary School HVAC and Fire Alarm Replacement ProjectUse SHIFT+ENTER to open the menu (new window).
2/21/2018 2:00 PMAwardedSupporting DocsC18-19 (ESPLOST)Bid; Construction
Mechanical Electrical and Plumbing Engineering Design Svcs (AC)Use SHIFT+ENTER to open the menu (new window).
12/6/2016 2:00 PMAwardedSupporting DocsRFQ C17-01Construction; RFQ
Metal Shelving (Annual Contract) (General and ESPLOST)Use SHIFT+ENTER to open the menu (new window).
6/21/2016 11:00 AMAwardedSupporting DocsBid C16-45 (ESPLOST)Bid; Construction
Myers Athletic Addition Roof Replacememt ProjectUse SHIFT+ENTER to open the menu (new window).
5/31/2018 2:00 PMAwardedSupporting DocsBid C18-14Bid; Construction
New Hampstead K-8 School - Timber Harvest Services 051719Use SHIFT+ENTER to open the menu (new window).
5/30/2019 11:00 AMAwardedSupporting DocsQuote M19721Bid; Construction
New Playground Equipment (Annual Contract)Use SHIFT+ENTER to open the menu (new window).
12/12/2019 11:00 AMOpenSupporting DocsBid C20-14Bid; Construction
New Replacement Facility White Bluff Elementary SchoolUse SHIFT+ENTER to open the menu (new window).
12/11/2018 11:00 AMAwardedSupporting DocsBid C19-11 (ESPLOST)Bid; Construction
Oatland Island Dock RenovationUse SHIFT+ENTER to open the menu (new window).
3/21/2019 11:00 AMAwardedSupporting DocsBid C19-16Bid; Construction
Oatland Island Wildlife Center Roof and Log ReplacementUse SHIFT+ENTER to open the menu (new window).
11/9/2017 11:00 AMAwardedSupporting DocsBid C18-13Construction
On-Call Architectural and Engineering Services (Annual Contract)Use SHIFT+ENTER to open the menu (new window).
8/24/2017 11:00 AMAwardedSupporting DocsRFQ C18-05 (ESPLOST)Construction; RFQ
On-Call Architectural and Engineering ServicesUse SHIFT+ENTER to open the menu (new window).
9/17/2015 2:00 PMAwardedSupporting DocsRFQ C16-11 (ESPLOST)Construction; RFQ
Partial Re-roof and Interior Upgrades at Charles Ellis Montessori K-8Use SHIFT+ENTER to open the menu (new window).
1/17/2017 11:00 AMAwardedSupporting DocsC17-16 (ESPLOST)Bid; Construction
1 - 100 Next